activity-based
常见例句
- Activity Based Management Using an activity-based costing system to improve the operations of an organization.
以活动为基础的管理利用以活动为基础的成本计算制度改善一家公司的运营。 - Activity Based Costing (ABC) is the media in the conbination of ABCM and the new ABMS.
作业成本计算(ABC)是作业成本管理与作业管理新体系联结的中介。 - Commercial satellite launching represents the peaceful use of space technologies and is a normal commercial activity based on mutual benefit.
商业卫星发射是空间技术的和平运用,是互惠互利的正常商务活动。 - Moral education base, scientific activity base and labor and technical education.
答:德育教育基地,科技活动基地,劳动技术基地。 - Many accounting articles state that the activity based costing can provide more useful information, and correspondingly add value to the companies.
许多会计文章也认为,作业成本计算制度能够提供更为有用的信息,并因此而能够增加公司的价值。 - Chapter three focuses on designing the form of Activity Based Cost System (ABCS), which is composed by the ABC, ABCM and performance value system.
作业成本体系的框架设计是文章论述的第三个问题。 作业成本体系框架由作业成本计算体系的设计,作业成本管理的设计以及业绩评价系统三部分组成。 返回 activity-based