flowshop
基本解释
- 流水车间
英汉例句
- At last thealgorithms are tested against by 21 Rec FlowShop problems. Also, the topologycharacteristics and the performance are analyzed as well.
最后针对21个Rec类FlowShop问题进行实证分析,分析了该类问题的拓扑空间特性以及杂交算法性能的改进情况。 - Multi-Objective Local Search(MOLS) algorithm was proposed to solve the permutation flowshop sequencing problem with bi-objectives of makespan and total flowtime.
针对求解最小化最大完工时间和总流程时间的多目标同顺序流水作业问题,提出了一个多目标局部搜索算法。 - Abstract: To solve the no-wait flowshop scheduling problem to minimize total tardiness with rule scheduling methods, it is necessary to compute every job's complete time.
中文摘要: 在使用规则调度方法求解无等待最小化总拖期流水车间调度问题时,前提是计算工件的完工时间。 - Computational results show that the proposed DPSO algorithm with the two-point inheritance scheme is very competitive for the lot streaming flowshop scheduling problem.
实验结果显示,利用两点继承机制的改善后DPSO演算法,在此排程问题上呈现最好的绩效。 - Then, we consider an n-job, m-machine lot streaming problem in a flowshop with equal-size sublots where the objective is to minimize the total weighted earliness and tardiness.
接著,我们考虑一个在n件工件及m部机器下,批量流在流程型工厂之排程问题,其目标是最小化总加权提早及延迟时间。