deterministic schedule
基本解释
- 確定性計劃;確定性排程,確定性調度
英汉例句
- This makes the 2.6 scheduler an O(1) process because the time to schedule is both fixed and deterministic regardless of the number of active tasks.
這使得 2.6 版本的調度器成爲一個複襍度爲 O(1) 的過程,因爲調度時間既是固定的,而且也不會受到活動任務個數的影響。 - To schedule deterministic pauses for GC, Metronome uses two different threads to achieve both consistent scheduling and short, uninterrupted pause times
爲了給 GC 調度確定性暫停,Metronome 使用了以下兩個不同的線程來完成一致性調度和短暫連續的暫停時間 - It is important to recognize, however, that CPM as a result of its deterministic nature would schedule projects only to the level of reliability of the input values of the duration of activities.
它是重要的是要承認,但是, CPM的,由於其性質確定性將如期項目不僅有利於水平的可靠程度,投入的價值觀會期活動。
雙語例句
词组短语
- deterministic communication scheduling 確定性通信調度
- Preemptive Deterministic Scheduling 搶佔確定性調度算法
短語
专业释义
- 確定性計劃
- 確定性排程